The stitched timeline

You always know where your order is.

Every UML order runs on the same ten-stage timeline. Each stage shows what we've completed, what's in progress, and what's waiting on you — with photos, reports and documents attached where they belong. This page is the exact journey your first order will take.

Reading the timeline: Your input — an approval or decision we wait for Our input — documents, photos or reports we upload Traceability — added to your permanent order record
  1. 1

    Enquiry & 24-hour quote

    Send a tech pack, sketch, reference garment or even a link. We confirm feasibility, propose fabric options and return a landed price (EXW, FOB or DDP) with a production timeline.

    Your input: design reference, target quantity & priceOur input: quotation & fabric proposals
  2. 2

    Order confirmation & deposit

    You approve the quote; we issue the proforma invoice. A 30–50% deposit books your fabric and production slot. Your order timeline goes live the same day.

    Your input: PI approval & depositTraceability: order record opened
  3. 3

    Tech pack & lab dips

    Our product developers finalize the spec — measurements, grading, trims, labels — and dye lab dips for each colorway. You approve colors against your standards before any fabric is knitted.

    Our input: final tech pack & physical lab dipsYour input: color approval
  4. 4

    Sample development

    Fit samples are cut, sewn and couriered to you in 10–15 days. Comment, request changes, and approve — most styles close in one or two rounds. Sampling fees are credited back on bulk.

    Our input: physical samples + fit photos on the timelineYour input: sample sign-off
  5. 5

    Fabric booking & testing

    Bulk fabric is knitted, dyed and tested — GSM, shrinkage, colorfastness, and OEKO-TEX/GOTS documentation where specified. Test reports upload to your order record.

    Our input: fabric test reportsTraceability: fabric origin & composition logged
  6. 6

    Pre-production sample & cut approval

    A PP sample from actual bulk fabric confirms everything before cutting. On your sign-off, the line is loaded and cutting begins.

    Your input: PP sample approval
  7. 7

    Bulk production with inline QC

    Sewing, decoration and finishing — with progress percentages updated on your timeline and inline QC checks photographed as your run advances. Issues get flagged and fixed in the line, not discovered at the port.

    Our input: progress % + inline QC photo reports
  8. 8

    Final inspection (AQL 2.5)

    A final random inspection to AQL 2.5 covers measurements, workmanship, packing and labeling. The full report — with photos — is shared for your ship approval. Third-party inspection (SGS/Intertek/QIMA) can be arranged on request.

    Our input: final inspection reportYour input: ship authorization
  9. 9

    Shipping & documents

    Balance payment, then dispatch by sea or air under your chosen incoterm. B/L or AWB, invoice, packing list and certificate of origin all post to your order record; DDP clients simply receive stock at their door or 3PL.

    Your input: balance & delivery detailsOur input: full shipping document set
  10. 10

    Delivered — with your transparency report

    Your order closes with a complete, shareable record: producing factory and its audit certificates, fabric origin and composition, test reports, and inspection results. It's your due-diligence file and your marketing asset, generated as a by-product of how we work.

    Traceability: transparency report issued
The traceability layer

One order. One verifiable story.

Regulation is moving one way: EU due-diligence rules, digital product passports, and US forced-labor enforcement all demand documented supply chains — even from small brands. Most manufacturers treat that as your problem. We treat it as part of the product.

Because every stage of your order already logs its documents, the compliance file assembles itself. At delivery you receive the transparency report; on request we add a per-product QR code linking to it — so your customers can scan a hangtag and see exactly where their garment was made.

Transparency report · UML-2611
  • Producing factory
    Audited knit unit, Gazipur — BSCI · WRAP certified (certs attached)
  • Fabric
    420 GSM brushed fleece · 80/20 cotton-poly · OEKO-TEX Standard 100
  • Testing
    Shrinkage, colorfastness & GSM reports · passed
  • Inspection
    Final AQL 2.5 · passed · full photo report

Shareable link + optional per-product QR code for your hangtags.

Coming next

The client portal

Today your timeline lives in structured updates and a status page per order. Rolling out next: a full client portal at portal.unitedmerchandiseltd.com — log in, see every order's timeline, approve samples and dips with one click, download your documents, and reorder in seconds. Early clients get first access.


Manufacturing without the black box.

Send your design — your tracked timeline starts with the quote.

Get a quote